a.s.r. real estate has acquired a majority stake, on behalf of the ASR Dutch Green Energy Fund I, in a battery storage facility at Strekdammen Wind Farm. The battery storage facility, also known as a Battery Energy Storage System (BESS), enables generated energy to be stored and supplied when required. The battery will be connected to wind farm Strekdammen in Eemshaven, Groningen, which is owned by the ASR Dutch Green Energy Fund I.
With this investment, the renewable energy fund of a.s.r. real estate contributes to enhancing the flexibility of the Dutch electricity grid. The ASR Dutch Green Energy Fund I has taken a majority interest in the battery storage facility. The remaining shares remain in the hands of Rebel Development and Pronewable, both of which will continue to commit to the operation of the facility.
The battery storage facility has a power capacity of 7.5 MW and a storage capacity of approximately 24 MWh. This allows the installation to store or deliver electricity for more than three hours, equivalent to approximately 11,700 MWh on an annual basis. This corresponds to the annual electricity consumption of around 5,200 households.
You can now read the full press release at the link below


